top of page
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
---|---|---|---|---|---|---|
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() |
RADIO FM MEDIA
September 2019
Adding to the empire! This project started with a 7,000 SF addition and has turned into a total renovation. The new addition boasts large, functional offices with floor to ceiling glass lining the hallway, A multi-purpose room that would put most homes to shame and a grand entry. The existing space has been renovated to add floor to ceiling glass and total upgrades on all the studios including granite counter tops and functional meeting and break rooms. This project was competed on time all while the entire building was occupied and ON AIR without interruption.
Architectural Design: GREAT STATES CONSTRUCTION
Interior Design: TREVER HILL
Photos By: HILARY EHLEN
bottom of page